Hauptseite/en
Aus LifadWiki
Weitere Sprachen
Weitere Optionen
This portal consolidates all technical content related to Rammstein's stadium stages and deployed hardware: stage construction, lighting, audio, video/LED, automation, pyrotechnics, power, and logistics. From here you can navigate to detailed pages for each tour/setup as well as component-based overviews (fixtures, consoles, PA systems, etc.).
Quick Start
Stadium Stage 2019–2024 | Lighting (Fixtures) | Audio (PA & Consoles) | Pyrotechnics & SFX |
---|---|---|---|
Compact datasheet, dimensions, functions, companies, logistics | Fixture types, positions, counts, patches, control | PA design, delays, sub architecture, FOH/monitors, I/O | Effects, fuels, safety, trigger/activation |
Video & LED | Automation & Mechanics | Power & Electrical | Sources & References |
LED walls, pixel maps, IMAG, signal flow | Lifts, moving elements, control, safety | Power feeds, generators, load profiles, redundancy | Collected links, interviews, trade press, manufacturer data |
Project Status
Project Status | |
---|---|
Data as of | 2025-08-21 |
Scope | Stadium stages & hardware (Focus: Europe Stadium Tour 2019–2024) |
Maintenance | LIFAD.WORLD Editorial · Community |
Guidelines | Sources for every data point; technical neutrality |
Scope & Vision
This page is the entry point for all technical topics.
- Detail pages for each stage/setup (e.g. Stage:Europe Stadium Tour 2019–2024) with datasheets and sources.
- Component directories (Hardware:Lighting, Hardware:Audio, Hardware:Video-LED, Hardware:Automation, Hardware:Pyrotechnics, Hardware:Power) – tour-spanning, equipment-based.
Stadium Stage 2019–2024 – Compact Data
- Note
- Detailed tables & sources on Stage:Europe Stadium Tour 2019–2024.
Metric | Value (Brief) | Note |
---|---|---|
Tower height | ≈ 36 m | central steel tower with integrated LED/lighting |
Total width (venue-dependent) | ≈ 55–60 m | incl. side towers/pods |
Total setup weight | > 300 t | steel + lighting/audio/video/SFX |
Transport | ≈ 60–66 trucks / set | A/B double set in rotation |
Setup/teardown | ~3 days steel + 1 day tech / teardown < 1–1.5 days | venue/wind dependent |
Power demand (peak) | ≥ 4–5 MW (total) | lighting + audio + automation + SFX |
Lighting control | MA Lighting (grandMA2 Full-Size), MA-Net/NPU | redundant control |
PA/FOH | L-Acoustics line arrays; FOH: Avid VENUE S6L | roof/field delays per venue |
Automation | movable elements (LED/pods/lifts) | safety approvals per country |
Pyrotechnics | flames/FX, high fuel load | permit & safety requirements |
Content Architecture
Naming Conventions
- Stages: Stage:Europe Stadium Tour 2019–2024
- Components: Hardware:Lighting, Hardware:Audio, Hardware:Video-LED, Hardware:Automation, Hardware:Pyrotechnics, Hardware:Power
- Documentation/Sources: Documentation:Sources
Recommended Section Structure (for detail pages)
- Overview (purpose, design concept, involved companies)
- Dimensions & Construction (dimensions, loads, materials, wind)
- Functions & Automation (moving parts, controls, safety)
- Lighting (fixtures, distributions, patches, control)
- Audio (system design, consoles, routing, delays)
- Video/LED (walls, IMAG, content flow, pixel maps)
- Pyro & SFX (types, permits, triggers)
- Power (feeds, generators, load curves)
- Logistics (trucks, crew, setup times)
- Sources (trade press, manufacturers, interviews)
Editorial Guidelines
- Source requirement: Every specific number (dimension, weight, fixture count, power specifications, etc.) must have a source.
- Version tracking: Document changes with date + brief comment.
- Neutrality: No speculation; use "≈" for ranges and provide justification.
- Security: Do not publish sensitive internal documents (e.g. security/emergency plans).
Next Steps
- Stage:Europe Stadium Tour 2019–2024 – Create detail page (tables for dimensions, lighting fixtures, PA blocks, power, logistics + sources).
- Hardware:Lighting – Equipment list (manufacturer/type/count/position/usage/DMX universes).
- Hardware:Audio – System blocks (mains, outfills/delays, subs, amps, FOH/monitor consoles, I/O).
- Hardware:Video-LED – LED specifications, mounting, signal flow.
- Hardware:Automation – Lifts, travel paths, control/protocols, safety.
- Hardware:Pyrotechnics – Effects, fuels, safety approvals.
- Hardware:Power – Feeds, generators, power profiles, redundancy.
- Documentation:Sources – Start central source list.